Castle Building Company Logo
2nd Floor Master Bathroom Remodel York St Denver CO Castle Building Company

We performed this home remodeling project in two phases so the client was able to continue living in the space. We began with the second floor of the home. Our talented design team presented drawings and 3D renderings of the remodeling project as well as a working budget. This Wash Park bungalow was redesigned to mix a modern look and feel while still retaining certain characteristics of the old neighborhood. Modern design elements included a spa shower in the master bathroom, a cozy fireplace in the master bedroom, and a study area for their daughter, which included a cork wall. After completion of the upstairs we performed a full remodel on the main floor, which included a world-class open concept kitchen equipped with Wolfe and Sub-Zero stainless steel appliances and custom floating counter tops, a circular main entryway and a family room with incredible cabinetry.

Please contact us for more information regarding this project and its elements.